MYLOR – BATHROOM
See images above from this lovely bathroom installed in a home in Mylor
- Removed entire existing suit, 1 wall and floor complete.
- Re configured and re plumbed entire room and fitted new floor boards back.
- Re wired entire room, fitting new extractor, lighting.
- Fitted two new towel radiators, separate bath and shower units.
- New vanity unit, sink and toilet fitted.
- Carried out wall and floor tiling.
- Intresting job overall and took 9 days to complete.